• linkedin
  • twitter
  • youtube
  • facebook
Lexington Institute
  • About
    • Mission
    • Biographical Information
    • Contact Us
  • Defense
  • Space
  • Energy
  • Logistics
  • Innovation
  • DC Tech Tracker
April 2, 2019
← Back
←Previous Post Next Post→

Army Moving To Delay Chinook Upgrades At Boeing Plant (Daily Times)

April 2, 2019
August 8, 2019
Monica Kern

In an article for Daily Times about the ramifications of delaying Chinook upgrades at a Boeing plant in Pennsylvania, Alex Rose references Lexington Institute’s Loren Thompson and his March 21 column for Forbes. “We’re not just looking at jobs potentially lost at the Boeing plant, we’re looking at the whole supply chain,” Thompson said. “There are about 2,000 workers at the plant who are engaged on the Chinook program,” he noted, also adding that “[t]he Army made this decision without thinking about the jobs…”

Read the full article here.

Find Archived Articles:

This entry was posted in Uncategorized. Bookmark the permalink.
Lexington Institute
  • linkedin
  • twitter
  • youtube
  • facebook
Sign Up For LexNext Emails »

1600 Wilson Boulevard - Suite 203 | Arlington, VA 22209 USA
Phone: 703.522.5828 | Fax: 703.522.5837
© 2026 Lexington Institute

Sign Up for LexNext Emails

"*" indicates required fields

Name*
I'm Interested in:
This field is for validation purposes and should be left unchanged.

Sign Up for LexNext Emails

"*" indicates required fields

Name*
I'm Interested in:
This field is for validation purposes and should be left unchanged.